Connecting the Camillus Erie Canal Trail – Reed Webster Park to Gere’s Lock

Work is underway to connect the Erie Cnal Trail from Reed Webster Park and going over part of Honeywells land and exiting that portion near the entrance to the Town Landfill. The trail would then utilize the existing roadway (Thomas Ave.) and follow that to Gere Lock Road. The trail would then be new at the old Gere Lock itself where a parking area will be placed and markers set up to see the exposed lock. The trail would then go through Solvay and end up at Bridge Street where you can then walk over the bridge to the Loop the Lake Trail. Work is underway and expected to be completed in the fall. A map can be accessed by clicking here Erie Canal Trail Extension

Comments are closed.